$34.00
(W)600mm x (D)600mm x (H)1020mmMDF Top with Wooden Legs
1-2 days, 3-4 days, 5-6 days
(W)700mm x (D)700mm x (H)1020mm MDF Top with Iron Leg Construction
(W)600mm x (D)600mm x (H)1050mmMDF Top with Iron Legs
(W)600mm x (D)600mm x (H)1050mmMetal Construction